List of Clients



the followings are list of clients (and referees) served by alamega konsult since 2009.

Disclaimer:
This website is designed to facilitate our existing clients in acquiring information for their vendor evaluation analysis which is related to their ISO 9001:2008 accreditation and for audit purposes and related works, as an information website for practical placement for diploma and degree undergraduates and as link to engineering academia who need information for engineering collaboration or sabbatical.
Showing 136 items
ClientProject (Short) TitleContract ValueComplete
Sort 
 
Sort 
 
Sort 
 
Sort 
 
ClientProject (Short) TitleContract ValueComplete
99 Speedmart Sdn . Bhd. Cadangan Membina Sebuah Gudang Serta Pejabat 3 Tingkat Di Atas Lot 12, Industrial Zon 7, Off Jalan 1 KKIP, Kota Kinabalu , Sabah.  Completed 
Anne Construction. Kerja kerja Pembaikan Cerun Di Kawasan Berhampiran Dengan Pejabat Dan Bengkel Bahagian Pengurusan Fasiliti Dan Pentadbiran UITM Cawangan Sabah, Kampus Kota Kinabalu, Sabah.   Completed 
Ao Yama Industries Proposed Reconstruction Of Existing Mattress Factory At LOT 42, SEDCO INDUSTRIAL ESTATE OFF MILE 5 ½, Tuaran Road, Kota Kinabalu , Sabah.  Completed 
Baycom Sdn . Bhd. Provision Of Broadband Access Services small Cell Solutions Under Part Via Of The Telecommunications And Multimedia Cumiversal Service Provision (USP) Repulations 2002 ‘’Contract’’) 40 site (Sabah Region)  Completed 
Bina Puri Properties Sdn Bhd Poposed 134 Units of 10 Storey Condominium Development on TL 017544777, Jalan Banjaran, Kepayan, Kota Kinabalu, Sabah. 60,000,000.00 Completed 
Bina Puri Properties Sdn Bhd (JV with Megatek Consulting Engineer) Proposed 80 units of 16-Storey Apartment on Cl 015329405 at Lorong Tahan 3, Taman Sentosa, Luyang, Kota Kinabalu, Sabah. 50,000,000.00 Completed 
Borneo Highway PDP Sdn . Bhd. Pelaksanaan Projek Lebuhraya Pan Borneo Sabah (Work Package - 7 Inanam To Sepanggar)  Construction Phase 
Bristeel Corp. Sdn . Bhd. Membina Baharu Bangunan Enam Bilik Darjah Dengan Kaedah IBS Untuk Sekolah Daif , Sabah (SK. Long Pasia , Sipitang)  Completed 
Bristeel Corp. Sdn . Bhd. Membina Baharu Bangunan Enam Bilik Darjah Dengan Kaedah IBS Untuk Sekolah Daif , Sabah (SK. Indarason Laut , Kudat)  Completed 
Buildskill Management Sdn . Bhd Proposed 3 storey Shop Cum Office (Block N) On Part Of TL. 117610497 Darvel Bay Development) Kg.Panji , Lahad Datu , Sabah.  Completed 
Bumisem Engineering Sdn . Bhd. Projek Bekalan Elektrik Luar Bandar (BELB) Sambungan Talian Grid Negeri Sabah Tahun 2016 2017 Secara Rundingan Terus (REKA DAN BINA) Zon 1 (PPU BAHAGIA, TENOM)  Completed 
Bumisem Engineering Sdn . Bhd. Projek Bekalan Elektrik Luar Bandar (BELB) Sambungan Talian Grid Negeri Sabah Tahun 2016 2017 Secara Rundingan Terus (REKA DAN BINA) Zon 1 (PPU MENGKABONG, TENOM)  Completed 
Client : GBG Properties (GBG) Sdn . Bhd. Proposed Temporary Ticketing Hall At Jesselton Point Kota Kinabalu , Sabah.  Design Stage 
Client : Kementerian Belia Dan Sukan Sabah / Rita Jaya Enterprise Projek cadangan pembinaan bumbung untuk Gelanggang sukan luar di kompleks sukan Kota Kinabalu ( Gelanggang Tenis , Bola Keranjang , Sepak Takraw dan Bola Tampar ) Likas , Sabah  Completed 
Client : Kementerian Belia Dan Sukan Sabah / SKT Wijaya Cadangan naiktaraf Kompleks sukan Sandakan Sempena Sukan Sabah (SAGA) ke lapan 2017,  Completed 
Client : Layan Enterprise (Kementerian Belia & Sukan , Sabah.) Proposed Pejabat Kementerian Belia & Sukan , Kudat.  Completed 
Client : Mega Urus Construction Sdn . Bhd. Cadangan Projek Pembinaan Rumah Imam Dan Bilal Di Universiti Malaysia Sabah (UMS)  Completed 
Client : Petronas Carigali Sdn . Bhd. Provision Of Office Building Structural Integrity Assessment For Petronas Carigali Sabah Operation Office Building.  Completed 
Datuk Abdul Rahman Bin Datuk Hj . Dahlan Proposed Extension & Renovation Of Double Storey Detached House No.71, Lot 179, Lorong Kingfisher Sulaman 2, Taman Kingfisher Sulaman , K. Kinabalu.  Completed 
DE Energy Sdn . Bhd. Permission For Access & Acquisition Of Water Supply From Jabatan Air Sabah At Penempatan Telipok , Kota Kinabalu.  Design Stage 
Desa Kim Loong Palm Oil Sdn Bhd Proposed 2MW Biogas Plant Project For Desa Kim Loong Palm Oil Sdn Bhd At Keningau , Sabah.  Design Stage 
Duke Enterprise Design, Supply and Reconstruction of Cable Bridge No.1 - 66kV Underground Cable TLPT - UMS6 at Tanjung Lipat, Likas, Sabah 200,000.00 Completed 
Emas Dinamik SDN. BHD. (SSGP) BV 101 Excavation and Site Preparation Works To Allow For Mechanical Repair of BV 101 36” Mainline Valve  Construction Phase 
EP Engineering Services Projek Bekalan Elektrik (BELB) Sistem Solar Hibrid Di Gugusan Kampung Long Pasia , Sabah.  Construction Phase 
Farrah Herriet Binti Masbok Proposed Temporary Open Shed Warehouse And Crossing Bridge On NT 213058345 At Kg. Tunoh , Penampang.  Completed 
Green Leadership Sdn . Bhd.  Proposed 1.0 MWP Building Intergrated,solar Photovoltaic System At Batu 5 ½ Jalan Nabawan Keningau , Sabah ( Phase II)  Completed 
Ioi Edible Oils Sdn . Bhd. Proposed New Fiber Warehouse Includes Access Road And Bridge To SRIKERJAWAN WAREHOUSE.  Completed 
Ioi Edible Oils Sdn . Bhd. Proposed 2 Storey Building Extention At Existing Administration Office At Km12, Sungai Mowtas , Jalan Jaya Chip, Off Jalan Satu Sapi , Sandakan.  Completed 
Jabatan Hal Ehwal Agama Islam Negeri Sabah Cadangan Kerja Kerja Merobohkan Bangunan Lama, Merekabentuk Dan Membina Semula Sekolah Agama Negeri (San) Banting Sipitang , Sabah.  Construction Phase 
Jabatan Hal Ehwal Agama Islam Negeri Sabah Proposed Masjid On C.L 075433037,Taman Mawar Sandakan.   Design Stage 
Jabatan Hal Ehwal Agama Islam Negeri Sabah Cadangan Membina Dan Menyiapkan Perpustakaan Islam Di Kota Kinabalu , Sabah.  Completed 
Jabatan Perhutanan , Sabah Upgrading Works Of Main Jetty At Pin Supu Forest Information Center & Tungog Camp Site At Kinabatangan.  Completed 
Jabatan Perhutanan , Sabah. Upgrading And Construction Of Work For Tourist Park At Ulu Kukut , Forest Reserve, Kota Belud , Sabah.  Completed 
Kementerian Belia Dan Sukan Sabah / Putera Kinabalu Kontraktor Projek Cadangan Naiktaraf Kompleks Sukan Kudat  Completed 
Kementerian Kemajuan Luar Bandar Dan Wilayah (KKLW) Projek Bekalan Air Luar Bandar (BALB) Kg. Bakung Bakung , Pulau Lihak Lihak Semporna Sabah.  Construction Phase 
Kementerian Kemajuan Luar Bandar Dan Wilayah ( KKLW) In Collaboration with Perunding Nusa Perdana Projek Sistem Bekalan Air Mukim Sukau  Completed 
Kementerian Kesejahteraan Bandar, Perumahan Dan Kerajaan Tempatan Mereka Bentuk , Membina Dan Menyiapkan 100 unit Rumah Sesebuah Bertiang Dan Kerja kerja Berkaitan Bagi Program Perumahan Rakyat (PPR) Di Pulau Mantanani, Kota Belud Sabah.  Design Stage 
Kementerian Pembangunan Beli , Kebudayaan & Kemajuan Sukan Sabah. Proposed New Squash Court At Sport Complex, Kota Kinabalu.  Design Stage 
Kementerian Pendidikan Malaysia Cadangan Menaiktaraf Sekolah Menengah Vokasional Tawau Kepada Kolej Vokasional Tawau , Sabah.  Design Stage 
Kementerian Pendidikan Malaysia Cadangan Membina Dan Menyiapkan SMK Kabogan Yang Mengandungi 24 Bilik Darjah Dan Lain lain Kemudahan Yang Berkaitan Di Semporna, Sabah.  Construction Phase 
Kementerian Pendidikan Malaysia Cadangan Kerja kerja Pembaikan Struktur Bangunan Dan Lain lain Kemudahan Berkaitan Di SK. Pekan Semporna, Sabah Secara Reka Dan Bina.  Completed 
Kementerian Pertahanan Malaysia Cadangan Merekabentuk Dan Membina Dua Buah Jambatan Dan Kerja Kerja Berkaitan Di Ranau , Sabah.  Completed 
Kinabalu International School. Proposed 4 storey Classroom Block Extension For Kinabalu International School On NT.88010141 At Bukit Padang, Kota Kinabalu ,  Completed 
KK Dinamik Sdn Bhd for PETRONAS Dagangan Proposed the Engineering Procurement, Construction & Commissioning of Accessories Store and Loader Rest Area Upgrading at Sepangar Bay LPG PETRONAS Terminal, Sepanggar, Kota Kinabalu, Sabah. 2,500,000.00 Completed 
KK Dinamik Sdn . Bhd. / Sime Darby Sdn . Bhd. Proposed Suction Water Tank & Pump House At Balung & Sipit Estate For Sime Darby Sdn . Bhd.  Completed 
Ko-Nelayan Projek Pengeluaran Benih Ikan Hiasan KO NELAYAN Di Kg.Koiduan , Papar , Sabah  Completed 
Ko-Nelayan Proposed Renovation To Existing Office At Ko Nelayan Sipitang , Sabah.  Completed 
Ko-Nelayan Cadangan Pembinaan Pusat Latihan Akuakultur KO NELAYAN di KG. LAYA LAYA Tuaran , Sabah.  Completed 
Ko-Nelayan Proposed Renovation to the Exisiting Building of Ko-Nelayan at Kudat, Sabah. 650,000.00 Construction Phase 
Ko-Nelayan Proposed Development Phase 2 at Wetland Park, Ko-Nelayan, Weston, Sabah. 500,000.00 Completed 
Kontraktor Somoroto Enterprise  Cadangan Kerja Kerja Membaiki dan Menaiktaraf Gelanggang Bola Keranjang di Jalan Tenaga Milik Perbadanan Labuan, Wilayah Persekutuan, Labuan.  Completed 
Kuala Penyu Solar Sdn . Bhd. Proposed Interconnection Of 0.7mwp Solar PV At Kayul , Kuala Penyu , Sabah.  Completed 
Layan Enterprise for Youth and Sport Ministry Sabah Proposed Ministry of Youth and Sport office, Kudat, Sabah. 1,200,000.00 Completed 
Lcs Energy Sdn . Bhd Cadangan Membina Sesebuah Rumah Hijau Setingkat Berbumbung Separa Lutsinar Di NT 03310295 Jalan Botong Rosok , Kota Belud , Sabah.  Completed 
Legend E&E Sdn Bhd. Proposed Development Of 32 Units 2 strorey Semi Showroom On Lot CL.015046090 At Jalan Tuaran , Telipok Kota Kinabalu , Sabah.  Design Stage 
Lembaga Perindustrian Kayu Malaysia (MTIB) Cadangan Renovasi Untuk Ruangan Pameran Lembaga Perindustrian Kayu Malaysia (MTIB) Di Lot 69, Block K, Alamesra ~ Sulaman Coastal Highway, Kota Kinabalu , Sabah.  Completed 
Lembaga Sukan Negeri Sabah. Kerja kerja pembaikan dan naiktaraf kemudahan DRY GYM di KOMPLEKS SUKAN KOTA KINABALU.  Completed 
Liput Best Corperation Membina dan menyiapkan sebuah masjid di KG. Lok Kawi Baru , Putatan Sabah.   Completed 
Majils Daerah Keningau Cadangan Projek Pembinaan Astaka Padang Bandaran Keningau , Majlis Daerah Keningau , Sabah.  Completed 
Majlis Daerah Kinabatangan. Proposed Design And Construction Of Community Hall At Kinabatangan, Sabah.  KIV 
Majlis Daerah Ranau Cadangan Pembinaan Bangunan Pejabat Baru Majlis Daerah Ranau , Sabah.  Construction Phase 
Majlis Ugama Islam Sabah Proposed Waterproofing and Tiling Works at Block A Wisma Muis, Kota Kinabalu, Sabah. 250,000.00 Completed 
Majlis Ugama Islam Sabah Proposed Replacement of Polycarbonate Roofing and Roof Structure Rehabilitation and Associated work for Wisma MUIS, Kota Kinabalu, Sabah. 1,500,000.00 KIV 
Majlis Ugama Islam Sabah (MUIS). Proposed Waterproofing (Roof Slab & Concrete Gutter) & Other Associated Works At Block A & Block B, Wisma Muis , Sabah.  Design Stage 
Malayan Banking Berhad Proposed Structural Integrity Checking And Preparation Of Report For Exisiting Maybank Premises At Kg.Air , Kota Kinabalu , Sabah.  Completed 
Malaysia Airport Holdings Berhad To Supply, Deliver, Install and Complete the Replacement and Associated Works at Sandakan Airport, Sandakan, Sabah. 1,500,000.00 Completed 
Malaysia Royal Air Force Proposed SAR Helicopter Shelter at TUDM Naval Base, Labuan F.T. 1,500,000.00 Construction Phase 
Malaysia Timber Industry Board Proposed Renovation for Gallery Space for MTIB at Lot 69, Block K, Alamesra - Sulaman Coastal Highwah, Kota Kinabalu, Sabah 1,500,000.00 Completed 
Maniplan Development Sdn Bhd Proposed 31 units 2.5 & 3 Storey Shop Offices (with Block Title to be Applied for) on 107508396, 107508403, 107508485, 107508494 & 107508501, Tawau, Sabah. 25,000,000.00 Construction Phase 
Maniplan Development Sdn . Bhd.  Proposed 31 Units 2.5 & 3 Storey Shop Offices (With Block Title To Be Applied For) On 107508396, 107508403, 107508485, 107508494 & 107508501 Tawau , Sabah.  Completed 
MASCOM (M) Sdn Bhd Proposed Amalgamation & Subdivision for 31 Storey Commercial with 2 Storey Basement Carpark on NT 21316301 & NT 213178520 off Jalan Pintas, Penampang, Sabah. 125,000,000.00 KIV 
Mee Woo Superstore Sdn . Bhd. Proposed ‘Holiday Retreat Center ’ On NT 133130766 At Kg.Beriawa , Jalan Beriawa , Keningau Sabah.  Completed 
Megatech Energy Sdn . Bhd. Proposed Subdivision & Development 0f 15 blocks (136 Units) Of 2 3 Storey Shoplot On 225312149 (Formerly 225147437 at Pekan Baru Kota Marudu , District Of Kota Marudu , Sabah.  Completed 
Megatech Energy Sdn Bhd Proposed Subdivision & Development of 15 Blocks (136 Units) of 2 -3 storey Shoplot on 225312149 at Pekan Baru Kota Marudu, Sabah. 35,000,000.00 Construction Phase 
Merju Juta Enterpirse Proposed PETRONAS Service Station And “HENTIAN REHAT DAN RAWAT” (R&R) At Part Of N.T 083017654, Kg. Telupid , District Of Labuk Sugut , Telupid , Sabah.  Design Stage 
Mr. Boon Voon Fatt Proposed Single Storey Open Warehouse At 015585207 Inanam , District Of Kota Kinabalu , Sabah.  Completed 
Mr. Chan Jian Hong Proposed 4 storey Apartment On Lot 7 (CL.015411677) And Lot 8 Kota Kinabalu ,  Completed 
MR Contractor Sdn . Bhd. Design, Supply, Construction, Testing & Commisioning Of Incoming Water Main & Ancillary Works For Proposed Mixed Development Of Commercial & Residential Apartment On CL 015126486 & 015123314 At Jalan Bantayan , Inanam Kota Kinabalu , Sabah.  Design Stage 
MR Contractor Sdn . Bhd. Cadangan Membina 250,000 Gallons Tangki Air Di Perumahan Kakitangan Awam Di Atas Lot 7526, Kg. Bukit Kuda , W.P Labuan.  Completed 
Mr. Jerrie Lister Proposed Semi detached Factory On Lot Nt 213197310, Kg. Tombovo , Penampang , Sabah.  Completed 
Mr. Wee Tung Heow Proposed 2 Storey Showroom / Office Building Cum Covered Shed At CL 015473499 K. Kinabalu , Sabah  Completed 
Mr. Wong Nyen Cho. Proposed 2 ½ Storey Semi Detached House On CL 01537070715 Kota Kinabalu , Sabah.   Completed 
Mr.Yap Yun Fen & Mdm. Len Wui Wui @ Lian Wui Wui Proposed Single Storey Open Warehouse At 015585190 Inanam , District Of Kota Kinabalu , Sabah.  Completed 
Naim Development Sdn . Bhd. Cadangan Membina Dan Menyiapkan Tangki 60,000 Gallons / 272m3 Termasuk Tangki Sedutan Dan Kerja Kerja Berkaitan Di Ladang FGVPM Sahabat 36, Cenderawasi , Lahad Datu , Sabah.  Construction Phase 
Natural Sea Product Sdn . Bhd. Proposed Open Factory And Storage Warehouse At Lot No. 15, IZ 7 (Phase 1) KKIP, Sabah.  Completed 
One World Target Construction Sdn Bhd Proposed Housing Development on CL 015539465 at Jalan Kionsom, Kota Kinabalu, Sabah. 25,000,000.00 KIV 
Oti Development Sdn . Bhd. (J.V With LPPB) Proposed Residential Development On L.A 80092528 At Kinabatangan New Township Kinabatangan Sabah.  Design Stage 
Pemborong Bukit Warisan / Jabatan Pembangunan Sumber Manusia Kerja kerja Penyelenggaraan Dua (2) Buah Blok Asrama Berkembar Lama Dan Kerja kerja Berkaitan Di ILTP Papar , Jabatan Pembangunan Sumber Manusia  Completed 
Penampang Parish Council Cadangan Bangunan Pertemuan Minggu Gembira Di Kg. Inobong Penampang , Sabah.  Completed 
Petrafa Sdn . Bhd. Cadangan Pembinaan ‘Green Tech Intergrated Rubber Based Recycle Plant’ Di Atas Lot No.11, Iz 12, Kota Kinabalu Industrial Park (KKIP) Sepanggar , Sabah.  KIV 
Petrafa Sdn Bhd Proposed Construction Green Tech Integrated Rubber Based Recycle Plant on Lot No.11, IZ 12, Kota Kinabalu Industrial Park, Sepanggar, Sabah. 3,500,000.00 Construction Phase 
Petronas Chemical Fertiliser Sabah SDN. BHD. First Cooler Outlet (E 39 06) For Service Platform & Sliding Pad  Completed 
PETRONAS Dagangan Proposed new Egress for Petrol Services Station at Lot 1 of NT 4468, Kuala Penyu, Sabah. 800,000.00 Completed 
PETRONAS Dagangan Proposed Underground Tank Replacement Works at PETRONAS Station KM 1.5, Jalan Mawar, Tawau, Sabah. 800,000.00 Design Stage 
PETRONAS Dagangan Proposed Upgrading PETRONAS Service Station n CL 045203413 at Mile 3, Jalan Utara, Sandakan, Sabah. 1,000,000.00 Completed 
PETRONAS Dagangan Proposed PETRONAS Service Station and RSR at Part of NT 083017654, Kampung Telupid, Telupid, Sabah. 4,500,000.00 Design Stage 
PETRONAS Dagangan Proposed PETRONAS Service Station on Lot CL 025317980 at Bongawan Town, Papar, Sabah. 4,500,000.00 Completed 
PETRONAS Dagangan Proposed Underground Tank Replacement Works at PETRONAS Station No.66, Jalan Batu 5.5, Jalan Tuaran, Kota Kinabalu, Sabah. 800,000.00 Design Stage 
PETRONAS Dagangan Proposed Upgrading And Renovation Of Existing Petrol Station On Part Of NT.233100939, Kg.Taka , Pekan Pitas, Sabah.  Completed 
Plus Solar System Sdn . Bhd. Proposed 1.0MWP Building Integrated Solar Photovoltaic At NT 063014719 KG. Nalapak , District Of Ranau , Sabah.  Completed 
Private Owner Proposed 2 Storey Showroom/office Building cum Covered Shed at Cl 015473499, Kota Kinabalu, Sabah. 2,500,000.00 Completed 
Private Owner Proposed Single Storey Open Warehouse at 015585190 Inanam, Kota Kinabalu, Sabah 500,000.00 Completed 
Private Owner Proposed Single storey Detached House on NT 6854, Kampung Pirasan, Kota Belud, Sabah 350,000.00 Completed 
Private Owner Proposed 6 Storey Condominium Apartment on NT 213145082 at Kampung Nosoob, Penampang, Sabah. 12,000,000.00 Design Stage 
Private Owner Proposed Temporary Open Shed Warehouse and Crossing Bridge on NT 213058345 at Kampung Tunoh, Penampang, Sabah. 250,000.00 Completed 
Private Owner Proposed Single Storey Open Warehouse at 015585207 Inanam, Kota Kinabalu, Sabah 500,000.00 Completed 
Private Owner Proposed 2 1/2 Storey Semi Detached House on CL 01537070715, Kota Kinabalu, Sabah 1,500,000.00 Completed 
Private Owner Proposed Semi Detached Factory on Lot NT 213197310, Kampung Tombovo, Penampang, Sabah. 1,500,000.00 Construction Phase 
Private Owner Proposed Removed and Rebuild Single Storey Semi Detached House on CL 015331138, Luyang, Kota Kinabalu, Sabah 350,000.00 Completed 
Private Owner Proposed 4-Storey Apartment on Lot 7 (CL 015411677) and Lot 8 (CL 015411686) At Jalan Damai, Kota Kinabalu, Sabah. 3,500,000.00 Construction Phase 
Puncak Deras Sdn . Bhd. Cadangan Perumahan Rakyat 1malaysia (PRIMA), Apartment Di Atas Tanah C.L8796 di Kg Ratau , Manggatal ,  Construction Phase 
Queens Hotel Proposed Renovation For Queens Hotel On Lot 7 At Suria Shopping Center , Jalan Masak , Keningau , Sabah.  Completed 
RFR Mantap Sdn Bhd Sewerage Treatment Plant Reinstatement Works at Taman Tab Fai Yen, Sandakan, Sabah 100,000.00 Completed 
Rfr Mantap Sdn Bhd (Design & Build) Pembaikan Semula Loji Kumbahan Najis Di Taman Tab Fai Yun, MPS, Sabah.  Completed 
Ritz Supplier SDN. BHD. (PCML) Provision of Service Platform, Monkey Ladder & Handrail Installation  Completed 
Ritz Supplier SDN. BHD. (PCML) Provision of Potable Water Pit Construction  Completed 
Sabah Forestry Upgrading Works of Main Jetty at Pin Supu Forest Information Center and Tungog Camp Site at Kinabatangan, Sabah 500,000.00 Completed 
Sabah Forestry Upgrading and Construction of work for Tourist Park at Ulu Kukut, Forest Reserve, Kota Belud, Sabah 500,000.00 Completed 
Shermadef Construction Sdn . Bhd. / Jabatan Kerja Raya. Cadangan Membina 50 Unit Medan Selera Diatas Sebahagian Lot TL207537068 Di Jalan Tg . Purun , W.P. Labuan.  Completed 
Sibuga Energy Sdn . Bhd.  Proposed 0.988 Mwp Building Integrated Solar Photovoltaic System At Jalan Lintas Sibuga , 90000 Sandakan, Sabah.  Completed 
Sipadan Mangrove Resort Sdn Bhd Proposed Road Upgrading works from Sg. Burung Junction to Ecotourism Complex Sipadan, Tawau, Sabah. 45,000,000.00 Completed 
Si Standard Sdn . Bhd.  Proposed 1.0 Mwp Building Integrated Solar Photovoltaic System At KG. Serusop , Tuaran , Sabah.  Completed 
St. Micheal's Board of Governors Proposed Image Enhancement and Drainage upgrading at SM St. Micheal Schools, Penampang, Sabah. 250,000.00 Completed 
Syabas Dunia Sdn Bhd Proposed 3 Storey Showroom at Tanjung Aru, Kota Kinabalu, Sabah. 2,500,000.00 Completed 
Tentera Udara Diraja Malaysia / Jabatan Kerja Raya Labuan. Proposed Helicopter Shelter At TUDM Naval Base, Wilayah Persekutuan, Labuan.  Completed 
Universiti Malaysia Sabah (UMS) Cadangan Projek Pembagunan Hatceri Komersial Institut Penyelidikan Marin Borneo Di Bawah Sumber Dalaman Universiti Bagi Tahun 2016.  Construction Phase 
University Malaysia Sabah Proposed Upgrading for Visual Art Studio at School of Art, UMS, Kota Kinabalu, Sabah 450,000.00 Completed 
University Malaysia Sabah Proposed Design and Upgrading works for Sport Facilities at UMS International Campus, Labuan F.T. 1,250,000.00 Completed 
University Malaysia Sabah Proposed Open with Roofing Futsal Court, UMS, Kota Kinabalu, Sabah. 480,000.00 Completed 
University Malaysia Sabah Proposed Renovation Works on Existing Building DKP-1 & DKP-2 and Convert to TASKA and TASKA Induk UMS, Sepanggar, Sabah. 1,800,000.00 Completed 
Wawasan Nur TSR Sdn . Bhd. Proposed Renovation For Lodging House On Ground Floor To Third Floor Of T.L 017505556, LOT NO 15 Lorong Pasar Baru 2, Kampung Air, Kota Kinabalu.  Completed 
Weida Sdn . Bhd. Proposed Chain Hoist Design With Supporting Structure For WEIDA Intergrated Industries Sdn . Bhd. For Tawau & Kota Kinabalu Factory.  Completed 
WEIDA Sdn Bhd Proposed Chain Hoist Design with supporting Structure for WEIDA Intergrated Industries Sdn Bhd for Tawau and Kota Kinabalu Factories. 500,000.00 Completed 
Wonsoyo Builders Proposed Subdivision on 2 Lot on CL 135355959 at Kampung Liawan, Keningau, Sabah. 5,000,000.00 Construction Phase 
Yayasan Sabah Group Proposed Refurbishment, Making Good & Installation Of M&E Works To Existing Sewerage Treatment Plant At Yayasan Sabah Compound, Likas Bay, Jalan Sulaman , Sabah.  Completed 
Yusais Juta Sdn Bhd Cadangan pembinaan Bangunan Dewan Serbaguna Dan Kemudahan Fasiliti Sukan di Kompoun Yayasan Sabah, Teluk Likas Sabah.  Completed 
Showing 136 items
Comments